Current Affairs for 14 June 2025

Current Affairs - June 2025

Current Affairs - 14 June 2025

14-Jun-2025 03:42 PM

1. In June 2025, which film festival announced Alexander Payne as the recipient of its honorary Leopard (Pardo d’Onore) award?

(A) Locarno

(B) Cannes

(C) Venice

(D) Berlin


2. Who won the bronze medal for India in the women’s 50m rifle 3 positions event at the ISSF World Cup 2025 in Munich?

(A) Elavenil Valarivan

(B) Anjum Moudgil

(C) Sift Kaur Samra

(D) Ashi Chouksey


3. As per ILOSTAT 2025, what percentage of India’s population is now covered under at least one social protection benefit?

(A) 51.1%

(B) 59.6%

(C) 64.3%

(D) 69.8%


4. Which country has won the UEFA Nations League 2024–25 title?

(A) France

(B) Germany

(C) Spain

(D) Portugal


5. Which regulatory body has mandated UPI payment mechanism for registered intermediaries in the securities market?

(A) SEBI

(B) RBI

(C) IRDAI

(D) PFRDA


6. When is the World Day Against Child Labour observed each year?

(A) June 10

(B) June 11

(C) June 12

(D) June 13


7. Which of the following best describes the nature of Exercise Shakti, which will be held from 18th June to 1st July at La Cavalerie?

(A) Biennial

(B) Trilateral

(C) Naval-only

(D) Annual


8. What was India’s Consumer Price Index (CPI) inflation rate in May 2025?

(A) 3.16%

(B) 2.82%

(C) 3.07%

(D) 1.78%


9. Who won the T20 Mumbai League 2025 title?

(A) SoBo Mumbai Falcons

(B) Thane Titans

(C) Shivaji Strikers

(D) MSC Maratha Royals


10. Which Indian city has been nominated as India’s official entry for the UNESCO Creative Cities Network 2025 under the category of Gastronomy?

(A) Hyderabad

(B) Lucknow

(C) Kolkata

(D) Indore


Arun-III Hydro Power Project symbolizing India-Nepal energy cooperation in the Himalayas

Arun-III Hydro Power Project: Strengthening India-Nepal Energy Ties

14-Jun-2025 02:00 PM

Arun-III Hydro Power Project: Strengthening India-Nepal Energy Ties
Category: Prelims – Current Affairs & Events


Overview of the Arun-III Project

The Arun-III Hydro Power Project is one of the most significant collaborative ventures between India and Nepal in the energy sector. Located in the Sankhuwasabha District in Eastern Nepal, this run-of-the-river project is being developed with Indian support. It is a landmark initiative that represents both infrastructural growth and regional cooperation.


Project Specifications and Capacity

The Arun-III project is designed to generate a total of 900 megawatts (MW) of electricity. It features:

  • A 70-meter high concrete gravity dam

  • An 11.74 km long Head Race Tunnel (HRT)

  • An underground powerhouse with four units of 225 MW each, positioned on the left bank of the Arun River

Once completed, it will become Nepal’s largest hydropower plant and will play a crucial role in meeting the energy demands of both Nepal and India.


India's Role in Development

The project is being developed by SJVN Arun-III Power Development Company (SAPDC), a wholly owned subsidiary of India’s Satluj Jal Vidyut Nigam (SJVN). SJVN is a joint venture between the Government of India and the Government of Himachal Pradesh.

The total estimated cost of the project is Rs. 144 billion, and it follows a Build-Own-Operate-Transfer (BOOT) model. Under this model, SAPDC will operate the plant for 25 years (excluding the 5-year construction phase) before handing it over to the Government of Nepal.


Power Sharing and Benefits

During the 25-year operational period, Nepal will receive 21.9% of the electricity produced free of cost. The rest of the power will primarily be exported to India, helping meet growing demand and boosting cross-border electricity trade. The energy will be transmitted from Dhalkebar (Nepal) to Muzaffarpur (India) via a dedicated transmission link.


Strategic and Economic Significance

This project not only strengthens energy security for both nations but also solidifies their economic and strategic relations. By sharing surplus electricity and jointly operating such infrastructure, India and Nepal are building long-term cooperation in sustainable development and clean energy.


FAQs: Quick Reference

Q1. Where is the Arun-III project located?
👉 Sankhuwasabha District, Eastern Nepal

Q2. What is the total installed capacity?
👉 900 MW

Q3. Who is developing the project?
👉 Satluj Jal Vidyut Nigam (SJVN) through its subsidiary SAPDC

Q4. How long will SAPDC operate the plant?
👉 25 years (excluding construction)

Q5. How much electricity will Nepal receive for free?
👉 21.9% of the total power generated


MCQs for Quick Revision

1. What is the total power capacity of the Arun-III Hydro Power Project?
A. 600 MW
B. 750 MW
C. 900 MW
D. 1000 MW
✔️ Answer: C. 900 MW

2. Which river hosts the Arun-III Hydro Power Project?
A. Bagmati
B. Koshi
C. Gandaki
D. Arun
✔️ Answer: D. Arun

3. The Arun-III Project is being implemented by which Indian company?
A. NTPC
B. NHPC
C. SJVN
D. PGCIL
✔️ Answer: C. SJVN

4. How much free power will Nepal receive during the operational period?
A. 10%
B. 15.5%
C. 21.9%
D. 25%
✔️ Answer: C. 21.9%

5. What is the model of project execution for Arun-III?
A. PPP
B. BOOT
C. EPC
D. FDI
✔️ Answer: B. BOOT